Site Maintained By ::

Site Maintained By :: Com. R.SRINIVASAN , SDE ( A/T) / KMB ,District Secretary, Mobile : 9486102191 / SNEA KMB., Web Site launched dt., 20-12-2011

Tuesday, 29 October 2013

Regular Promotion to the Executives in AGM /DE

On  OCT 25 \  2013 Corporate  office order 412-16 / 2013 released for
Regular Promotion to the Executives in AGM /DE of Telecom Operation
Stream in the IDA scale of   Rs. 29100-54500 .

Hearty Congratulations to  Our Comrade

Shri. M.Haja alaudeen  DGM-CFA  / KMB.,

Thursday, 24 October 2013

Our “Hearty Congratulations” & “ Best wishes” to The Vishist Sanchar Sewa Padak Awardee [2013] Shri. M.Muthurasu TTA / mayiladuthurai CM section

Our “Hearty Congratulations” & “ Best wishes” to
The Vishist Sanchar Sewa Padak Awardee [2013]

Shri. M.Muthurasu  TTA / mayiladuthurai  CM section 

Wednesday, 23 October 2013

SNEA(I)/CHQ/DIR(HR)/2012-14/21                 Dated 21st October, 2013.

To
            Sh A. N. Rai,
            Director (HR),
            BSNL Corporate Office,
New Delhi.

Sub:- Implementation of first Time Bound promotion uniformly after 4 years for all the Executives, instead of 4 to 6 years, to end discrimination of JTO/JAOs of recruitment of 1993/94/95/96/97/98/99 with respect to later recruitments:-
Sir,
The Time Bound Promotion policy was implemented in BSNL w.e.f. 01.10.2000 vide order dated 18.01.2007. As per the TBP policy, the first time bound promotion will be due on completion of 4 years of service from 01.10.2000 subject to the condition that Executives basic pay in the current IDA scale has crossed/touched the minimum of the next higher pay scale for which his upgradation is considered (relevant portion of the TBP order dated 18.01.2007, para 3.1 is attached). This condition of 4 years was incorporated in the Time Bound Promotion policy inorder to address the issue of past service weightage in DoT prior to 01.10.2000, otherwise Executives of many recruitment years would get bunched together and their first Time Bound Promotion would be due after 6 years only. As a result, those reaching minimum of upgradation scale in 4 years got their first Time Bound Promotion on 1.10.2004 whereas others got it depending upon when they reached minimum of upgradation scale, however, not later than 1.10.2006. Actual demand of the Associations was however that first Time Bound Promotion should be uniformly given after 4 years to all the Executives, regardless of whether one reaches minimum of upgradation scale or not.
          After implementation of 2nd PRC report w.e.f 01.01.2007, a very serious anomaly has arisen because of this condition. After 01.01.2007, executives got their first time bound promotion after four years whereas JTOs recruited in DOT in 1993/94/95/96/9798/99 and eligible for service weightage got their first time bound promotion after six years. This discrepancy arose because before revision of pay scales, first Time Bound Promotion to JTOs of 93/94/95/96/97/98/99 was given from E1A to E2A scale in 2008 after completion of 6 years. However, after revision of the pay scale in 2007, all the Executives started getting their first Time Bound Promotion immediately after 4 years or as on 01.01.2007 since Time Bound Promotion is now being given from E1A to E2 scale (provisional), instead of from E1A (E1+5 Increment, provisional) to E2A. This was precisely the demand raided by this Association i.e first time bound promotion   for all the Executives after 4 years of service at the time of finalization of EPP.
This has resulted in a serious anomalous situation wherein executives who were eligible for their first upgradation prior to 01.01.2007 got it after 6 years whereas those who became eligible for first Time Bound Promotion after 1.1.1007 are getting it after 4 years. In other words, the JTOs of 1993/94/95/96/97/98/99 recruitment years got their first Time Bound Promotion on 01.10.2006, after 6 years of service since 01.10.2000 whereas the JTO/JAOs recruited after 1999 are getting their first Time Bound Promotion immediately after 04 years of service on 01.01.2007 itself. Thus in effect JTO/JAOs of 1993, 1994, 1995, 1996, 1997, 1998 and 1999 recruitment years having put in 3 to 4 years of service in DoT prior to 01.10.2000 virtually got their first Time Bound Promotion after 9 to 10 years of service.
          This issue can be addressed conclusively only by extending the first time bound promotion uniformly for all the executives after 4 years of service w.e.f 01.10.2000 without any condition of crossing/touching the minimum of the next higher pay scale for which his upgradation is considered. Your kind personal intervention is solicited to address this issue by suitably amending the Time Bound Promotion policy provisions to end discrimination among the Executives.
With regards,


(K. Sebastin)

Copy to:
1.     Sri K C G K Pillai, DIR(Fin), BSNL Board for information and n/a please
2.     Sri S. S. Aggarwal, GM(Pers), BSNLCO for information and n/a please.
3.     Sri. R K Goyal, GM(Estt), BSNLCO for information and n/a please









Tuesday, 22 October 2013

OUR GS letter to CMD BSNL reg., E2, E3 PAY SCALES of JTO/JAO, SDE/AO

No: SNEA(I)/CHQ/CMD/2012-14/28         Dated 18.10.2013.
To
Shri R. K. Upadhyay,
CMD, BSNL,
New Delhi.

Sub:- Non finalization of standard pay scales E2, E3 etc of basic cadres JTO/JAO, SDE/AO etc for the last 6 years demoralizing thousands of talented and young JTOs/JAOs recruited after 01.01.2007---Major obstacle towards resolution of the issue, ie. pension contribution on actual basic pay instead of maximum of the pay scale stands resolved --- immediate kind intervention solicited to resolve the issue to restore the dignity and sagging morale of thousands of Executives:
Respected Sir,
Finalization of standard pay scales of E2, E3, E4 etc for JTO/JAO, SDE/AO etc has been persistently raised by this Association. At the time of implementation of 2nd PRC report by BSNL, Management proposed E1A, E2A, E3, E4, E5, E6 pay scales for the Executives. The intermediate pay scale of E1A and E2A proposed for JTO/JAO and SDE/AO cadres were rejected repeatedly by DoT since DPE reiterated time and again that all CPSUs should introduce standard IDA pay scales recommended by 2nd PRC and approved by the Govt/DPE, and wherever non standard pay scales are existing, action should be taken to switch over to standard IDA pay scales. CPSUs like BHEL, NTPC, ONGC etc switched over from intermediate pay scales to standard IDA pay scales as per DPE order. Despite clear instructions from DPE to CPSUs to stick to standard scales, BSNL, time and again, proposed non standard scales of E1A/E2A for JTO/SDE to DoT for its approval.
JTO/JAO, SDE/AO cadres in general and JTO/JAOs in particular recruited after 01.01.2007 are the worst sufferers of this anomalous situation. Their pay scales are not finalised even after six and half years. Similarly the pay scale of their promotional post, SDE/AO is also not finalised so far. Since the pay scales of the basic cadre JTO/JAO and the promotional post SDE/AO are “provisional”, the time bound promotions from JTO/JAO grade to SDE/AO grade and subsequent upgradations also became “provisional” as it vary with the finalization of the pay scales. The JTOs of 2007 and 2008 batch were recruited in the pre revised pay scale of E1A (9850-250-14600). The notification for the JTO recruitment also envisages that the “pay scale will be revised shortly and it is likely to be revised upwards". Based on this assurance, they decided to get recruited in BSNL years back.
However, these brilliant and young Executives, full of potential and talent, were shocked and demoralized at their very entry in the Company by downgrading their pay scales from E1A to E1, provisionally, incredibly resulting in a pay loss of Rs 4000 to Rs 5000 per month. Similarly, pay scale of SDE/AO also was downgraded from E2A to E2 provisionally. This decision of BSNL tantamount to demotion of key and basic cadres of JTO/SDE which are to play a pivotal role in revival and future growth of the Company. Human Resource managers in BSNL made a serious judgmental error by astonishingly ignoring incredible and huge potential of these brilliant people and shockingly instead decided to demoralize them at the very start of their career in the Company.
In order to address the issue of pay loss of the newly recruited JTOs of 2007 and 2008 batches, a committee was constituted under the Chairmanship of Sri K C G K Pillai, the PGM(FP/PF). This Association strongly demanded the implementation of standard pay scale of E2, E3, E4 etc as directed by the Govt/DPE in order to address the issue in its totality. However, the committee informed us that this proposal may not have much financial implication for the JTO/JAOs recruited after 01.01.2007 but shall have huge financial implications in terms of its cascading effect in so far as pension contribution on the maximum of the pay scale is concerned. In case the pension contribution issue is resolved and the Govt. decides BSNL has to pay pension contribution on the actual basic pay instead of the maximum of the pay scale, then the Management would be in a position to consider implementation of standard IDA pay scales from E2, E3------- to E7 for JTO, SDE, --- to SGJAG. At that time, likely expenditure to be incurred on implementation of standard IDA pay scales worked out to be about 20 to 25 Crores per annum, minus pension contribution.
Thereafter, this Assn and the Management also continuously pursued the issue of pension contribution on actual basic with the DOT with all the justifications. Recently we have been informed that finally Dept of Expenditure/ Ministry of Finance has agreed to the proposal of the BSNL Management and this Association that BSNL pension contribution would be on actual basic pay, instead of the maximum of the pay scales. By this decision of the Govt., the major impediment faced by the management to implement the standard pay scales of E2, E3, E4 etc is conclusively over and the issue can be addressed now since financial implications would be considerably narrowed down.
Considering the fact that introduction of standard IDA pay scales beginning from E2 for JTOs and onwards will result in huge motivation to thousands of Executives, and especially to the thousands of JTO/JAOs recruited after 01.01.2007, and the positive impact that it will have on the growth of the Company, the expenditure of few crores would be quite worthwhile. It would herald the beginning of a new era for young and potential Executives who are demoralised at the very beginning of their career and will surely result in increased productivity in the coming days. Further the implementation of standard pay scales in BSNL is absolutely imperative, considering that recommendations of 3rd PRC likely to be constituted by the Govt. shortly are to take effect from 01.01.2017 for CPSUs. BSNL cannot by any stretch of imagination approach the 3rd PRC in an anomalous situation where it is not having standard IDA pay scale at the entry level itself.
As the Chief Executive of this mighty organization, you may appreciate the concern raised by the Assn due to the non finalization of the standard pay scales of the basic/entry cadre in BSNL for the last 6 1/2 years which has resulted in large scale demoralization and resentment among the Executives. Now since the major hurdle for the implementation of standard pay scales, ie pension contribution on actual basic pay instead of maximum of the pay scale, is resolved, there appears to be no justification to delay the implementation of standard pay scales in BSNL. Your kind personal intervention is immediately solicited for the resolution of this most important cadre issue in BSNL which shall definitely and inevitably have a very positive impact on the growth of the Company.  
With regards,

(K. Sebastin)

Copy to:
1) Sri A. N. Rai, DIR(HR), BSNL for information and n/a please.
2) Sri K. C. G. K. Pillai, DIR(Fin), BSNL for information and n/a please.
3) Sri M C Choube, Chairman, Joint Committee for information and n/a please.
4) Sri R. K. Goyal, GM(Estt) for information and n/a please.
5) All Joint Committee members for information and n/a please.



Sunday, 13 October 2013

Happy Dussehra

                                                            SARASWATHY POOJA 

Wednesday, 9 October 2013

KMB SSA --UDAAN-IN ALL INDIA SSA -RANK LIST-NO. 2-Congratulations ! to all of them for the above achievement!

ALL India SSA's Ranking List for UDAAN For SEPTEMBER-2013 



RANK
SSA
CIRCLE
LH
LL_LH
LL_LC
LL_MIS
LL_SCR
BB_LH
BB_LC
BB_MIS
BB_SCR
TOT_SCR
2
KUMBAKONAM
TAMILNADU
667
282
218
333
9.69
484
397
450
41.61
51.3

Method To Calculate SSA Rank:- 
FORMULA
http://117.239.190.180/chart/rank-formula.GIF
1.LH :-Total leads handelled. i.e. All such leads on which some action had taken in the particular month.

2.LH(LL):-Total LL leads handelled.i.e. All LL leads on which some action had taken in particular month.

3.LC(LL):-Total LL leads completed in particular month.

4.LL(MIS):-TOTAL Landline connection given in particular month as per CDR (including through UDAAN).

5.LH(BB):-Total LL leads handelled.i.e. All LL leads on which some action had taken in particular month.

6.LC(BB):-Total LL leads completed in particular month.

7.BB(MIS):-TOTAL Landline connection given in particular month as per CDR (including through UDAAN).

8. Depending on TOTALscore the ranking has done.


Note: Lead Types
 Newline,Broadband & Landline+Broadband are taken for ranking SSA 

Top of Form
Bottom of Form